The breezeway (space between our house and garage) will be gone very soon! That space will become our third car garage and we will have a double garage door on the front of the existing garage. In addition, we are having the power line that now goes over our yard to the house put under ground (how else can Jason properly play basketball?) and getting a new roof. So far, we have a new driveway, a giant trench in the backyard (for the conduit and wire), and our existing garage is down to its frame. The project should be done mid-July!
The trench is about 4 feet deep. I'm glad I didn't have to dig it!
The old driveway is gone!
The garage is down to the frame!